Upgrade:Reactor (Level 9)

From VsWiki
Revision as of 10:17, 22 December 2006 by Salvager Aeron (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Level 9 Reactor Upgrade

This reactor is produced by Centech, and thus is built on their precision equipment. Because of the machining method they use, the reactor can have more features and still weigh in at 1/100th of a metric ton.

Purchasing Data

Average Price 128000
Mass 0.01 (Metric ton)
Volume 18 (Cubic meter)