Difference between revisions of "Trading System Design"

From VsWiki
Jump to: navigation, search
(Problems)
(Solutions)
Line 12: Line 12:
  
 
== Solutions ==
 
== Solutions ==
The solutions and the spirit of the new system
+
The solutions and the spirit of the new system:
 
+
* A dynamic universe in which player can leave its mark
 
+
* Great fortunes made on opportunity Trades, and Blockade breaking
 +
* New possibilities for mission generation and AI opportunities
 +
* Killing entire factions by disabling "one minor trading route"
 +
* Saving entire base population by delivering a critical O2 package in time
  
 
== The Design ==
 
== The Design ==

Revision as of 20:58, 10 March 2008

About

This page should be dedicated to design a new trading system, that would make the Vega Strike universe more believable, dynamic and fun to play.


Problems

The problems with current system:

  • The pricing is too uniform
  • Player or NPC actions are not affecting the System
  • Supply/Demand is not reflected
  • Blockade is not implemented
  • Resources are not affecting the Objects - Planets/Bases/Ships

Solutions

The solutions and the spirit of the new system:

  • A dynamic universe in which player can leave its mark
  • Great fortunes made on opportunity Trades, and Blockade breaking
  • New possibilities for mission generation and AI opportunities
  • Killing entire factions by disabling "one minor trading route"
  • Saving entire base population by delivering a critical O2 package in time

The Design

  • Cargo groups
    • Price modifiers for cargo groups
  • Planet types
    • Modifiers for planet types
  • Price formulas
  • Availability modifiers
    • Produces [ware] - means the object (planet, ship or station) produces defined number of items per day
      • One item per defined time could be nicer to look at, but harder to implement?
    • Consumes [wares] - means the object (planet, ship or station) consumes defined number of items per day.
      • If failed should disable defined availability modifier until next success. This allows for production only if required raw materials are provided.
      • Should allow defining more than one ware with individual number.